Reference Source

Utah

For Utah, governing body is Utah Labor Commission, Division of Boiler, Elevator, and Coal Mine Safety; statute citation is Utah Condensed Constitution, Title 34A. Utah Labor Code, Chapter 7. Safety , Sections 101 through 104; power boiler inspection interval is Annual certificate inspection; Annual external inspection while under operating conditions; low-pressure boiler inspection interval is biennial certificate inspection; pressure vessel inspection interval is High-pressure heat exchangers: biennial certificate inspection; All others: quadrennial certificate inspection, recorded from its source on 2026-08-05.

State
Utah
Governing body
Utah Labor Commission, Division of Boiler, Elevator, and Coal Mine Safety unconfirmed
Statute citation
Utah Condensed Constitution, Title 34A. Utah Labor Code, Chapter 7. Safety , Sections 101 through 104. unconfirmed
Power boiler inspection interval
Annual certificate inspection; Annual external inspection while under operating conditions unconfirmed
Low-pressure boiler inspection interval
biennial certificate inspection
Pressure vessel inspection interval
High-pressure heat exchangers: biennial certificate inspection; All others: quadrennial certificate inspection
Accepted inspector types
Inspections made by inspectors employed by insurance companies holding a Utah Certificate of Competency are accepted in lieu of inspections by division inspectors.
Exemptions
Those boilers or pressure vessels under federal control; Boilers and pressure vessels located in private residences or in apartment houses with fewer than five family units; Hot-water supply boilers directly fired with oil, gas, or electricity when heat input does not exceed 200,000 BTU per hour, water temperature 210°F, water-containing capacity 120 gallons unconfirmed
Sourcenationalboard.org
Verified2026-08-05
Review by2027-08-05
DatasetUS boiler and pressure vessel inspection requirements by state

Values marked unconfirmed are shown, but we could not tie them to the quote below: Exemptions, Governing body, Power boiler inspection interval, Statute citation. Read the quote and judge them yourself.

What the source says

High-pressure heat exchangers: biennial certificate inspection; All others: quadrennial certificate inspection. Upon application from the owner/user (with a recommendation by the state boiler inspector or special inspector), the Labor Commission may authorize extension of the inspection period. Extension shall be granted in writing by the safety director with original and one copy going to the boiler operator and a second copy going to the authorized inspector. When the commission grants an extension, a new certificate (to be properly posted) will be issued to replace the original shorter-term certificate. The old certificate shall be destroyed. Owner/user pressure vessels shall be inspected in accordance with ANSI/API-510 when such owner/user organizations are approved by the commission. INSURANCE INSPECTION REQUIREMENTS Inspections made by inspectors employed by insurance companies holding a Utah Certificate of Competency are accepted in lieu of inspections by division inspectors. Reports of certificate inspection must be filed with the division on approved forms within 30 days.

nationalboard.org, retrieved 2026-08-05

Source

Last verified against source: 2026-08-05. Scheduled for re-check by: 2027-08-05. This page as Markdown · OKF bundle · full dataset as JSON.