Reference Source

Time taken to build up air pressure/vacuum to safe working value not in accordance with the requirements

For Time taken to build up air pressure/vacuum to safe working value not in accordance with the requirements, category is Major; inspection item number is 1.1.3; defect reference is (b); inspection item is Air and vacuum systems; authority is DVSA MOT (cars, vans and passenger vehicles, classes 3, 4, 5, 7), recorded from its source on 2026-08-06.

Defect
Time taken to build up air pressure/vacuum to safe working value not in accordance with the requirements verified
Category
Major verified
Inspection item number
1.1.3
Defect reference
(b) verified
Inspection item
Air and vacuum systems
Authority
DVSA MOT (cars, vans and passenger vehicles, classes 3, 4, 5, 7) our reading
Sourcegov.uk
Verified2026-08-06
Review by2027-02-02
DatasetVehicle inspection defect categories: MOT major, minor and dangerous verdicts

Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.

What the source says

(b) | Time taken to build up air pressure/vacuum to safe working value not in accordance with the requirements | Major

gov.uk, retrieved 2026-08-06

Source

Last verified against source: 2026-08-06. Due for re-check by 2027-02-02. This page as Markdown · OKF bundle · full dataset as JSON.