Clifton unit 1, KS — planned retirement, EIA data for May 2026
For Clifton unit 1, KS, planned retirement year is 2028; planned retirement month is 6; net summer capacity (mw) is 76.2; technology is Natural Gas Fired Combustion Turbine; fuel code is NG; operator is Sunflower Electric Power Corp, verified against its source on 2026-09-24.
- Plant
- Clifton verified
- EIA plant ID
- 8037 verified
- Generator ID
- 1 verified
- Planned retirement year
- 2028 verified
- Planned retirement month
- 6 verified
- Operator
- Sunflower Electric Power Corp verified
- EIA entity ID
- 18315 verified
- Producer type
- Electric Utility verified
- State
- KS verified
- Net summer capacity (MW)
- 76.2 verified
- Technology
- Natural Gas Fired Combustion Turbine verified
- Fuel code
- NG verified
- Prime mover
- GT verified
- EPM edition
- May 2026 verified
What the source says
2028 6 18315 Sunflower Electric Power Corp Electric Utility Clifton KS 8037 1 76.2 Natural Gas Fired Combustion Turbine NG GT
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf