Clifton unit 2, KS — planned retirement, EIA data for May 2026

For Clifton unit 2, KS, planned retirement year is 2028; planned retirement month is 6; net summer capacity (mw) is 2.5; technology is Petroleum Liquids; fuel code is DFO; operator is Sunflower Electric Power Corp, verified against its source on 2026-09-24.

Plant
Clifton verified
EIA plant ID
8037 verified
Generator ID
2 verified
Planned retirement year
2028 verified
Planned retirement month
6 verified
Operator
Sunflower Electric Power Corp verified
EIA entity ID
18315 verified
Producer type
Electric Utility verified
State
KS verified
Net summer capacity (MW)
2.5 verified
Technology
Petroleum Liquids verified
Fuel code
DFO verified
Prime mover
IC verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2028 6 18315 Sunflower Electric Power Corp Electric Utility Clifton KS 8037 2 2.5 Petroleum Liquids DFO IC

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24