# Clifton — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For Clifton, eia plant id is 8037; generator id is 1; planned retirement year is 2028; planned retirement month is 6; operator is Sunflower Electric Power Corp, verified against its source on 2026-08-11. - **Plant:** Clifton _(verified: appears in the quote below)_ - **EIA plant ID:** 8037 _(verified: appears in the quote below)_ - **Generator ID:** 1 _(verified: appears in the quote below)_ - **Planned retirement year:** 2028 _(verified: appears in the quote below)_ - **Planned retirement month:** 6 _(verified: appears in the quote below)_ - **Operator:** Sunflower Electric Power Corp _(verified: appears in the quote below)_ - **EIA entity ID:** 18315 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** KS _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 76.2 _(verified: appears in the quote below)_ - **Technology:** Natural Gas Fired Combustion Turbine _(verified: appears in the quote below)_ - **Fuel code:** NG _(verified: appears in the quote below)_ - **Prime mover:** GT _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2028 | 6 | 18315 | Sunflower Electric Power Corp | Electric Utility | Clifton | KS | 8037 | 1 | 76.2 | Natural Gas Fired Combustion Turbine | NG | GT | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).