Copenhagen Wind Farm unit CPHGN, NY — planned retirement, EIA data for May 2026

For Copenhagen Wind Farm unit CPHGN, NY, planned retirement year is 2043; planned retirement month is 12; net summer capacity (mw) is 79.9; technology is Onshore Wind Turbine; fuel code is WND; operator is EDF Renewable Asset Holdings, Inc, verified against its source on 2026-09-24.

Plant
Copenhagen Wind Farm verified
EIA plant ID
58979 verified
Generator ID
CPHGN verified
Planned retirement year
2043 verified
Planned retirement month
12 verified
Operator
EDF Renewable Asset Holdings, Inc. verified
EIA entity ID
57170 verified
Producer type
IPP verified
State
NY verified
Net summer capacity (MW)
79.9 verified
Technology
Onshore Wind Turbine verified
Fuel code
WND verified
Prime mover
WT verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2043 12 57170 EDF Renewable Asset Holdings, Inc. IPP Copenhagen Wind Farm NY 58979 CPHGN 79.9 Onshore Wind Turbine WND WT

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.