Copenhagen Wind Farm unit CPHGN, NY — planned retirement, EIA data for June 2026
For Copenhagen Wind Farm unit CPHGN, NY, planned retirement year is 2043; planned retirement month is 12; net summer capacity (mw) is 79.9; technology is Onshore Wind Turbine; fuel code is WND; operator is EDF Renewable Asset Holdings, Inc, verified against its source on 2026-09-24.
- Plant
- Copenhagen Wind Farm verified
- EIA plant ID
- 58979 verified
- Generator ID
- CPHGN verified
- Planned retirement year
- 2043 verified
- Planned retirement month
- 12 verified
- Operator
- EDF Renewable Asset Holdings, Inc. verified
- EIA entity ID
- 57170 verified
- Producer type
- IPP verified
- State
- NY verified
- Net summer capacity (MW)
- 79.9 verified
- Technology
- Onshore Wind Turbine verified
- Fuel code
- WND verified
- Prime mover
- WT verified
- EPM edition
- June 2026 verified
What the source says
2043 | 12 | 57170 | EDF Renewable Asset Holdings, Inc. | IPP | Copenhagen Wind Farm | NY | 58979 | CPHGN | 79.9 | Onshore Wind Turbine | WND | WT
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip