UI RCP Bridgeport Seaside unit BPFC, CT — planned retirement, EIA data for May 2026
For UI RCP Bridgeport Seaside unit BPFC, CT, planned retirement year is 2035; planned retirement month is 11; net summer capacity (mw) is 2.5; technology is Other Natural Gas; fuel code is NG; operator is United Illuminating Co, verified against its source on 2026-09-24.
- Plant
- UI RCP Bridgeport Seaside verified
- EIA plant ID
- 60054 verified
- Generator ID
- BPFC verified
- Planned retirement year
- 2035 verified
- Planned retirement month
- 11 verified
- Operator
- United Illuminating Co verified
- EIA entity ID
- 19497 verified
- Producer type
- Electric Utility verified
- State
- CT verified
- Net summer capacity (MW)
- 2.5 verified
- Technology
- Other Natural Gas verified
- Fuel code
- NG verified
- Prime mover
- FC verified
- EPM edition
- May 2026 verified
What the source says
2035 11 19497 United Illuminating Co Electric Utility UI RCP Bridgeport Seaside CT 60054 BPFC 2.5 Other Natural Gas NG FC
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf