# UI RCP Bridgeport Seaside — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For UI RCP Bridgeport Seaside, eia plant id is 60054; generator id is BPFC; planned retirement year is 2035; planned retirement month is 11; operator is United Illuminating Co, verified against its source on 2026-08-11. - **Plant:** UI RCP Bridgeport Seaside _(verified: appears in the quote below)_ - **EIA plant ID:** 60054 _(verified: appears in the quote below)_ - **Generator ID:** BPFC _(verified: appears in the quote below)_ - **Planned retirement year:** 2035 _(verified: appears in the quote below)_ - **Planned retirement month:** 11 _(verified: appears in the quote below)_ - **Operator:** United Illuminating Co _(verified: appears in the quote below)_ - **EIA entity ID:** 19497 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** CT _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 2.5 _(verified: appears in the quote below)_ - **Technology:** Other Natural Gas _(verified: appears in the quote below)_ - **Fuel code:** NG _(verified: appears in the quote below)_ - **Prime mover:** FC _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2035 | 11 | 19497 | United Illuminating Co | Electric Utility | UI RCP Bridgeport Seaside | CT | 60054 | BPFC | 2.5 | Other Natural Gas | NG | FC | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).