El Centro Hybrid unit 4, CA — planned retirement, EIA data for May 2026
For El Centro Hybrid unit 4, CA, planned retirement year is 2029; planned retirement month is 8; net summer capacity (mw) is 67.6; technology is Natural Gas Steam Turbine; fuel code is NG; operator is Imperial Irrigation District, verified against its source on 2026-09-24.
- Plant
- El Centro Hybrid verified
- EIA plant ID
- 389 verified
- Generator ID
- 4 verified
- Planned retirement year
- 2029 verified
- Planned retirement month
- 8 verified
- Operator
- Imperial Irrigation District verified
- EIA entity ID
- 9216 verified
- Producer type
- Electric Utility verified
- State
- CA verified
- Net summer capacity (MW)
- 67.6 verified
- Technology
- Natural Gas Steam Turbine verified
- Fuel code
- NG verified
- Prime mover
- ST verified
- EPM edition
- May 2026 verified
What the source says
2029 8 9216 Imperial Irrigation District Electric Utility El Centro Hybrid CA 389 4 67.6 Natural Gas Steam Turbine NG ST
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf