# El Centro Hybrid — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For El Centro Hybrid, eia plant id is 389; generator id is 4; planned retirement year is 2029; planned retirement month is 8; operator is Imperial Irrigation District, verified against its source on 2026-08-11. - **Plant:** El Centro Hybrid _(verified: appears in the quote below)_ - **EIA plant ID:** 389 _(verified: appears in the quote below)_ - **Generator ID:** 4 _(verified: appears in the quote below)_ - **Planned retirement year:** 2029 _(verified: appears in the quote below)_ - **Planned retirement month:** 8 _(verified: appears in the quote below)_ - **Operator:** Imperial Irrigation District _(verified: appears in the quote below)_ - **EIA entity ID:** 9216 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** CA _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 67.6 _(verified: appears in the quote below)_ - **Technology:** Natural Gas Steam Turbine _(verified: appears in the quote below)_ - **Fuel code:** NG _(verified: appears in the quote below)_ - **Prime mover:** ST _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2029 | 8 | 9216 | Imperial Irrigation District | Electric Utility | El Centro Hybrid | CA | 389 | 4 | 67.6 | Natural Gas Steam Turbine | NG | ST | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).