ISO 7870-3:2012
For ISO 7870-3:2012, item title is Control charts — Part 3: Acceptance control charts; status code is 9599; successor is ISO 7870-3:2020; withdrawn / published date is 2012-02-22, recorded from its source on 2026-08-05.
- Identifier
- ISO 7870-3:2012 verified
- Item title
- Control charts — Part 3: Acceptance control charts verified
- Status code
- 9599 verified
- Successor
- ISO 7870-3:2020
- Withdrawn / published date
- 2012-02-22 verified
Verified
Review by
What the source says
40175,IS,,ISO 7870-3:2012,Control charts — Part 3: Acceptance control charts,Cartes de contrôle — Partie 3: Cartes de contrôle pour acceptation,2012-02-22,1,['03.120.30'],ISO/TC 69/SC 4,9599,[14943],[80092],['en'],20,"<p>ISO 7870-3:2012 gives guidance on the uses of acceptance control charts and establishes general procedures for determining sample sizes, action limits and decision criteria. This chart should be used only when: a) the within subgroup variation is in-control and the variation is estimated efficiently; b) a high level of process capability has been achieved.</p><p>This chart is typically used when the process variable under study is normally distributed, however, it can be app
— isopublicstorageprod.blob.core.windows.net, retrieved 2026-08-05
Source
- isopublicstorageprod.blob.core.windows.nethttps://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv