ISO 7870-2:2013
For ISO 7870-2:2013, item title is Control charts — Part 2: Shewhart control charts; status code is 9599; successor is ISO 7870-2:2023; withdrawn / published date is 2013-03-25, recorded from its source on 2026-08-05.
- Identifier
- ISO 7870-2:2013 verified
- Item title
- Control charts — Part 2: Shewhart control charts verified
- Status code
- 9599 verified
- Successor
- ISO 7870-2:2023
- Withdrawn / published date
- 2013-03-25 verified
Verified
Review by
What the source says
40174,IS,,ISO 7870-2:2013,Control charts — Part 2: Shewhart control charts,Cartes de contrôle — Partie 2: Cartes de contrôle de Shewhart,2013-03-25,1,['03.120.30'],ISO/TC 69/SC 4,9599,"[22211,15366]",[78859],['en'],44,"<p>ISO 7870-2:2013 establishes a guide to the use and understanding of the Shewhart control chart approach to the methods for statistical control of a process.</p><p>ISO 7870-2:2013 is limited to the treatment of statistical process control methods using only the Shewhart system of charts. Some supplementary material that is consistent with the Shewhart approach, such as the use of warning limits, analysis of trend patterns and process capability is briefly introduced. There a
— isopublicstorageprod.blob.core.windows.net, retrieved 2026-08-05
Source
- isopublicstorageprod.blob.core.windows.nethttps://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv