Reference Source

Oklahoma

What is the governing body for Oklahoma?

For Oklahoma, governing body is Department of Labor, Safety Standards Division; statute citation is Oklahoma State Statutes, Title 40. Labor, Oklahoma Boiler and Pressure Vessel Law, Sections 141.0 through 141.20 and Administrative Rules 380:25; power boiler inspection interval is Power boilers and high-temperature, high-pressure boilers: Internal 1 Year, External 1 Year (under pressure); low-pressure boiler inspection interval is Low-pressure steam and vapor heating boilers: Internal 2 Years, External 1 Year. Hot-water heating and hot-water supply boilers: Internal at the discretion of the inspector, External 1 Year; pressure vessel inspection interval is Pressure vessels subject to internal corrosion: Internal 3 Years, External 3 Years. Pressure vessels not subject to internal corrosion: Internal 10 Years, External 3 Years, recorded from its source on 2026-08-05.

Item | Internal | External | Power boilers and high-temperature, high-pressure boilers | 1 Year | 1 Year* | Low-pressure steam and vapor heating boilers | 2 Years | 1 Year | Hot-water heating and hot-water supply boilers | ** | 1 Year | Hot-water supply heaters | *** | 2 Years | Pressure vessels, excluding those within the scope of API Inspection Code, subject to internal corrosion, and waste heat team generators | 3 Years | 3 Years | Pressure vessels not subject to internal corrosion | 10 Years | 3 Years | *Under pressure. **At the discretion of the inspector. ***Only those located in public facilities. Vessels within the scope of the API Inspection Code shall be inspected as prescribed therein. Downstream welded steam piping exceeding 15 psi requires inspection.

nationalboard.org, retrieved 2026-08-05

State
Oklahoma
Governing body
Department of Labor, Safety Standards Division
Statute citation
Oklahoma State Statutes, Title 40. Labor, Oklahoma Boiler and Pressure Vessel Law, Sections 141.0 through 141.20 and Administrative Rules 380:25.
Power boiler inspection interval
Power boilers and high-temperature, high-pressure boilers: Internal 1 Year, External 1 Year (under pressure).
Low-pressure boiler inspection interval
Low-pressure steam and vapor heating boilers: Internal 2 Years, External 1 Year. Hot-water heating and hot-water supply boilers: Internal at the discretion of the inspector, External 1 Year.
Pressure vessel inspection interval
Pressure vessels subject to internal corrosion: Internal 3 Years, External 3 Years. Pressure vessels not subject to internal corrosion: Internal 10 Years, External 3 Years.
Accepted inspector types
Inspections made by insurance company inspectors may be accepted in lieu of inspections made by a department inspector, provided a photostatic copy of the inspector's National Board Certificate is furnished to the department and the inspector is authorized by the commissioner of labor.
Exemptions
Pressure vessels not exceeding 15 cubic feet in volume and 250 psig. Low-pressure steam boilers, hot-water heating boilers, hot-water supply boilers, hot-water supply heaters, or pressure vessels located in private residences or in apartment houses of fewer than six family units. Pressure vessels on remote sites limited to oil- and natural gas-gathering facilities, processing plants or gas-producing lease locations.
Sourcenationalboard.org
Verified
Review by
DatasetUS boiler and pressure vessel inspection requirements by state