Oklahoma
For Oklahoma, governing body is Department of Labor, Safety Standards Division; statute citation is Oklahoma State Statutes, Title 40. Labor, Oklahoma Boiler and Pressure Vessel Law, Sections 141.0 through 141.20 and Administrative Rules 380:25; power boiler inspection interval is Power boilers and high-temperature, high-pressure boilers: Internal 1 Year, External 1 Year (under pressure); low-pressure boiler inspection interval is Low-pressure steam and vapor heating boilers: Internal 2 Years, External 1 Year. Hot-water heating and hot-water supply boilers: Internal at the discretion of the inspector, External 1 Year; pressure vessel inspection interval is Pressure vessels subject to internal corrosion: Internal 3 Years, External 3 Years. Pressure vessels not subject to internal corrosion: Internal 10 Years, External 3 Years, recorded from its source on 2026-08-05.
- State
- Oklahoma unconfirmed
- Governing body
- Department of Labor, Safety Standards Division unconfirmed
- Statute citation
- Oklahoma State Statutes, Title 40. Labor, Oklahoma Boiler and Pressure Vessel Law, Sections 141.0 through 141.20 and Administrative Rules 380:25. unconfirmed
- Power boiler inspection interval
- Power boilers and high-temperature, high-pressure boilers: Internal 1 Year, External 1 Year (under pressure).
- Low-pressure boiler inspection interval
- Low-pressure steam and vapor heating boilers: Internal 2 Years, External 1 Year. Hot-water heating and hot-water supply boilers: Internal at the discretion of the inspector, External 1 Year.
- Pressure vessel inspection interval
- Pressure vessels subject to internal corrosion: Internal 3 Years, External 3 Years. Pressure vessels not subject to internal corrosion: Internal 10 Years, External 3 Years.
- Accepted inspector types
- Inspections made by insurance company inspectors may be accepted in lieu of inspections made by a department inspector, provided a photostatic copy of the inspector's National Board Certificate is furnished to the department and the inspector is authorized by the commissioner of labor. unconfirmed
- Exemptions
- Pressure vessels not exceeding 15 cubic feet in volume and 250 psig. Low-pressure steam boilers, hot-water heating boilers, hot-water supply boilers, hot-water supply heaters, or pressure vessels located in private residences or in apartment houses of fewer than six family units. Pressure vessels on remote sites limited to oil- and natural gas-gathering facilities, processing plants or gas-producing lease locations. unconfirmed
Values marked unconfirmed are shown, but we could not tie them to the quote below: Accepted inspector types, Exemptions, Governing body, State, Statute citation. Read the quote and judge them yourself.
What the source says
Item | Internal | External | Power boilers and high-temperature, high-pressure boilers | 1 Year | 1 Year* | Low-pressure steam and vapor heating boilers | 2 Years | 1 Year | Hot-water heating and hot-water supply boilers | ** | 1 Year | Hot-water supply heaters | *** | 2 Years | Pressure vessels, excluding those within the scope of API Inspection Code, subject to internal corrosion, and waste heat team generators | 3 Years | 3 Years | Pressure vessels not subject to internal corrosion | 10 Years | 3 Years | *Under pressure. **At the discretion of the inspector. ***Only those located in public facilities. Vessels within the scope of the API Inspection Code shall be inspected as prescribed therein. Downstream welded steam piping exceeding 15 psi requires inspection.
— nationalboard.org, retrieved 2026-08-05