Reference Source

New York

For New York, governing body is New York Department of Labor's Boiler Safety Bureau; statute citation is New York State Laws, Labor, Chapter 31, Article 7, Section 204; power boiler inspection interval is annual internal and external inspections, with external inspections conducted approximately six months after internal inspections; low-pressure boiler inspection interval is triennial internal inspections and biennial external inspections (steam); internal inspections every five years and biennial external inspections (hot-water); accepted inspector types is commissioned insurance company inspectors and National Board-commissioned shop inspectors, recorded from its source on 2026-08-05.

State
New York verified
Governing body
New York Department of Labor's Boiler Safety Bureau
Statute citation
New York State Laws, Labor, Chapter 31, Article 7, Section 204 verified
Power boiler inspection interval
annual internal and external inspections, with external inspections conducted approximately six months after internal inspections verified
Low-pressure boiler inspection interval
triennial internal inspections and biennial external inspections (steam); internal inspections every five years and biennial external inspections (hot-water)
Accepted inspector types
commissioned insurance company inspectors and National Board-commissioned shop inspectors verified
Exemptions
Boilers located on farms and used solely for agricultural purposes. Steam or vapor boilers operating at a gage pressure of not more than 15 psi located in dwellings occupied by fewer than six families. Hot-water boilers located in dwellings occupied by fewer than six families. Low-pressure boilers under 100,000 BTU per hour. per nationalboard.org
Sourcechardonlabs.com
Verified2026-08-05
Review by2027-08-05
DatasetUS boiler and pressure vessel inspection requirements by state

What the source says

The New York Department of Labor’s Boiler Safety Bureau administers inspections under New York State Laws, Labor, Chapter 31, Article 7, Section 204. Authorized inspector types: New York accepts commissioned insurance company inspectors and National Board-commissioned shop inspectors. Inspection frequency: High-pressure steam boilers require annual internal and external inspections, with external inspections conducted approximately six months after internal inspections.

chardonlabs.com, retrieved 2026-08-05

Sources disagree

More than one authority states this, and they do not state the same thing. Both are reproduced with the source each came from — deciding between them is yours, not ours.

Governing body

chardonlabs.com says governing body is New York Department of Labor's Boiler Safety Bureau, as of 2026-08-05.

The New York Department of Labor’s Boiler Safety Bureau administers inspections under New York State Laws, Labor, Chapter 31, Article 7, Section 204. Authorized inspector types: New York accepts commissioned insurance company inspectors and National Board-commissioned shop inspectors. Inspection frequency: High-pressure steam boilers require annual internal and external inspections, with external inspections conducted approximately six months after internal inspections.

https://www.chardonlabs.com/resources/commercial-boiler-inspection-regulations-by-state/

nationalboard.org says governing body is New York Department of Labor, Boiler Safety Bureau, as of 2026-08-05.

New York State Laws, Labor, Chapter 31. Article 7, Section 204. RULES FOR CONSTRUCTION AND STAMPING Construction:

https://www.nationalboard.org/PrintAllSynopsis.aspx?Jurisdiction=Select

Statute citation

chardonlabs.com says statute citation is New York State Laws, Labor, Chapter 31, Article 7, Section 204, as of 2026-08-05.

The New York Department of Labor’s Boiler Safety Bureau administers inspections under New York State Laws, Labor, Chapter 31, Article 7, Section 204. Authorized inspector types: New York accepts commissioned insurance company inspectors and National Board-commissioned shop inspectors. Inspection frequency: High-pressure steam boilers require annual internal and external inspections, with external inspections conducted approximately six months after internal inspections.

https://www.chardonlabs.com/resources/commercial-boiler-inspection-regulations-by-state/

nationalboard.org says statute citation is New York State Laws, Labor, Chapter 31. Article 7, Section 204., as of 2026-08-05.

New York State Laws, Labor, Chapter 31. Article 7, Section 204. RULES FOR CONSTRUCTION AND STAMPING Construction:

https://www.nationalboard.org/PrintAllSynopsis.aspx?Jurisdiction=Select

Power boiler inspection interval

chardonlabs.com says power boiler inspection interval is annual internal and external inspections, with external inspections conducted approximately six months after internal inspections, as of 2026-08-05.

The New York Department of Labor’s Boiler Safety Bureau administers inspections under New York State Laws, Labor, Chapter 31, Article 7, Section 204. Authorized inspector types: New York accepts commissioned insurance company inspectors and National Board-commissioned shop inspectors. Inspection frequency: High-pressure steam boilers require annual internal and external inspections, with external inspections conducted approximately six months after internal inspections.

https://www.chardonlabs.com/resources/commercial-boiler-inspection-regulations-by-state/

nationalboard.org says power boiler inspection interval is High-pressure steam boilers: Internal 1 Year, External 1 Year. High-pressure hot-water boilers: Internal 3 Years (annually if equipped with manholes and handholes), External 1 Year., as of 2026-08-05.

New York State Laws, Labor, Chapter 31. Article 7, Section 204. RULES FOR CONSTRUCTION AND STAMPING Construction:

https://www.nationalboard.org/PrintAllSynopsis.aspx?Jurisdiction=Select

Low-pressure boiler inspection interval

chardonlabs.com says low-pressure boiler inspection interval is triennial internal inspections and biennial external inspections (steam); internal inspections every five years and biennial external inspections (hot-water), as of 2026-08-05.

The New York Department of Labor’s Boiler Safety Bureau administers inspections under New York State Laws, Labor, Chapter 31, Article 7, Section 204. Authorized inspector types: New York accepts commissioned insurance company inspectors and National Board-commissioned shop inspectors. Inspection frequency: High-pressure steam boilers require annual internal and external inspections, with external inspections conducted approximately six months after internal inspections.

https://www.chardonlabs.com/resources/commercial-boiler-inspection-regulations-by-state/

nationalboard.org says low-pressure boiler inspection interval is Low-pressure steam boilers: Internal 3 Years, External 2 Years. Low-pressure hot-water boilers: Internal 5 Years, External 2 Years., as of 2026-08-05.

New York State Laws, Labor, Chapter 31. Article 7, Section 204. RULES FOR CONSTRUCTION AND STAMPING Construction:

https://www.nationalboard.org/PrintAllSynopsis.aspx?Jurisdiction=Select

Accepted inspector types

chardonlabs.com says accepted inspector types is commissioned insurance company inspectors and National Board-commissioned shop inspectors, as of 2026-08-05.

The New York Department of Labor’s Boiler Safety Bureau administers inspections under New York State Laws, Labor, Chapter 31, Article 7, Section 204. Authorized inspector types: New York accepts commissioned insurance company inspectors and National Board-commissioned shop inspectors. Inspection frequency: High-pressure steam boilers require annual internal and external inspections, with external inspections conducted approximately six months after internal inspections.

https://www.chardonlabs.com/resources/commercial-boiler-inspection-regulations-by-state/

nationalboard.org says accepted inspector types is Inspections made by inspectors employed by insurance companies and commissioned by the department are accepted in lieu of inspections made by a department inspector., as of 2026-08-05.

New York State Laws, Labor, Chapter 31. Article 7, Section 204. RULES FOR CONSTRUCTION AND STAMPING Construction:

https://www.nationalboard.org/PrintAllSynopsis.aspx?Jurisdiction=Select

Sources

Last verified against source: 2026-08-05. Due for re-check by 2027-08-05. This page as Markdown · OKF bundle · full dataset as JSON.