Reference Source

supermarket systems · installation · § 84.54(c)(12)(ii)(A)

What is the maximum gwp for supermarket systems · installation · § 84.54(c)(12)(ii)(A)?

For supermarket systems, restriction type is installation; cfr paragraph is § 84.54(c)(12)(ii)(A); maximum gwp is 150; effective date is January 1, 2032; conditions is Systems with a refrigerant charge capacity of 200 pounds or greater, that are not the high temperature side of a cascade system, recorded from its source on 2026-08-06.

(ii) Effective January 1, 2032, supermarket systems using a regulated substance, or a blend containing a regulated substance, as follows: (A) Systems with a refrigerant charge capacity of 200 pounds or greater, that are not the high temperature side of a cascade system, using a regulated substance, or a blend containing a regulated substance, with a global warming potential of 150 or greater;

— ecfr.gov, retrieved 2026-08-06

Sector/subsector
supermarket systems verified
Restriction type
installation our reading
Maximum GWP
150 verified
Effective date
January 1, 2032 verified
Conditions
Systems with a refrigerant charge capacity of 200 pounds or greater, that are not the high temperature side of a cascade system verified
CFR paragraph
§ 84.54(c)(12)(ii)(A) our reading
Sourceecfr.gov
Verified
Review by
DatasetUS AIM Act sector-specific refrigerant GWP limits and compliance dates (40 CFR 84.54)

Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.