NIST SP 800-53 Rev 5.2.0 CP-6(2) — Recovery Time and Recovery Point Objectives
What is the what it requires, verbatim for NIST SP 800-53 Rev 5.2.0 CP-6(2) — Recovery Time and Recovery Point Objectives?
For NIST SP 800-53 Rev 5.2.0 CP-6(2), what it requires, verbatim is Configure the alternate storage site to facilitate recovery operations in accordance with recovery time and recovery point objectives; control title is Recovery Time and Recovery Point Objectives; family is Contingency Planning, verified against its source on 2026-11-15.
Configure the alternate storage site to facilitate recovery operations in accordance with recovery time and recovery point objectives.
— raw.githubusercontent.com, retrieved 2026-11-15
- Citation
- CP-6(2) our reading
- Framework
- NIST SP 800-53 Rev 5.2.0 our reading
- Control
- CP-6(2)
- Control title
- Recovery Time and Recovery Point Objectives verified
- Family
- Contingency Planning verified
- What it requires, verbatim
- Configure the alternate storage site to facilitate recovery operations in accordance with recovery time and recovery point objectives. verified
Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.
Cite as: NIST SP 800-53 Rev 5.2.0 CP-6(2) — Recovery Time and Recovery Point Objectives (Security and compliance controls, one provision at a time: NIST SP 800-53 and the HIPAA Security Rule in their own words), referencesource.org/security-compliance-controls/cp-6-2/, checked 2026-11-15.
Where each value comes from
This source states these in separate places, so each value is shown with the passage that states it.
Framework
"title": "Electronic (OSCAL) Version of NIST SP 800-53 Rev 5.2.0 Controls and SP 800-53A Rev 5.2.0 Assessment Procedures",
Control and Control title
"id": "cp-6.2", "class": "SP800-53-enhancement", "title": "Recovery Time and Recovery Point Objectives",
Family
"id": "cp", "class": "family", "title": "Contingency Planning",
— all from raw.githubusercontent.com, retrieved 2026-11-15
Source
- raw.githubusercontent.comhttps://raw.githubusercontent.com/usnistgov/oscal-content/main/nist.gov/SP800-53/rev5/json/NIST_SP-800-53_rev5_catalog.json