Crystal River unit ST4, FL — planned retirement, EIA data for May 2026

For Crystal River unit ST4, FL, planned retirement year is 2034; planned retirement month is 6; net summer capacity (mw) is 712.0; technology is Conventional Steam Coal; fuel code is BIT; operator is Duke Energy Florida, LLC, verified against its source on 2026-09-24.

Plant
Crystal River verified
EIA plant ID
628 verified
Generator ID
ST4 verified
Planned retirement year
2034 verified
Planned retirement month
6 verified
Operator
Duke Energy Florida, LLC verified
EIA entity ID
6455 verified
Producer type
Electric Utility verified
State
FL verified
Net summer capacity (MW)
712.0 verified
Technology
Conventional Steam Coal verified
Fuel code
BIT verified
Prime mover
ST verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2034 6 6455 Duke Energy Florida, LLC Electric Utility Crystal River FL 628 ST4 712.0 Conventional Steam Coal BIT ST

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24