Crystal River unit ST4, FL — planned retirement, EIA data for May 2026
For Crystal River unit ST4, FL, planned retirement year is 2034; planned retirement month is 6; net summer capacity (mw) is 712.0; technology is Conventional Steam Coal; fuel code is BIT; operator is Duke Energy Florida, LLC, verified against its source on 2026-09-24.
- Plant
- Crystal River verified
- EIA plant ID
- 628 verified
- Generator ID
- ST4 verified
- Planned retirement year
- 2034 verified
- Planned retirement month
- 6 verified
- Operator
- Duke Energy Florida, LLC verified
- EIA entity ID
- 6455 verified
- Producer type
- Electric Utility verified
- State
- FL verified
- Net summer capacity (MW)
- 712.0 verified
- Technology
- Conventional Steam Coal verified
- Fuel code
- BIT verified
- Prime mover
- ST verified
- EPM edition
- May 2026 verified
What the source says
2034 6 6455 Duke Energy Florida, LLC Electric Utility Crystal River FL 628 ST4 712.0 Conventional Steam Coal BIT ST
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf