Silverstrand Grid Energy Storage System unit SLV01, CA — planned retirement, EIA data for May 2026

For Silverstrand Grid Energy Storage System unit SLV01, CA, planned retirement year is 2041; planned retirement month is 4; net summer capacity (mw) is 11.0; technology is Batteries; fuel code is MWH; operator is Silverstrand Grid, LLC, verified against its source on 2026-09-24.

Plant
Silverstrand Grid Energy Storage System verified
EIA plant ID
63735 verified
Generator ID
SLV01 verified
Planned retirement year
2041 verified
Planned retirement month
4 verified
Operator
Silverstrand Grid, LLC verified
EIA entity ID
63424 verified
Producer type
IPP verified
State
CA verified
Net summer capacity (MW)
11.0 verified
Technology
Batteries verified
Fuel code
MWH verified
Prime mover
BA verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2041 4 63424 Silverstrand Grid, LLC IPP Silverstrand Grid Energy Storage System CA 63735 SLV01 11.0 Batteries MWH BA

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.