Caldwell Wastewater Treatment Plant Hybr unit PV1, NJ — planned retirement, EIA data for May 2026
For Caldwell Wastewater Treatment Plant Hybr unit PV1, NJ, planned retirement year is 2036; planned retirement month is 12; net summer capacity (mw) is 0.7; technology is Solar Photovoltaic; fuel code is SUN; operator is Caldwell Wastewater Treatment Plant, verified against its source on 2026-09-24.
- Plant
- Caldwell Wastewater Treatment Plant Hybr verified
- EIA plant ID
- 62027 verified
- Generator ID
- PV1 verified
- Planned retirement year
- 2036 verified
- Planned retirement month
- 12 verified
- Operator
- Caldwell Wastewater Treatment Plant verified
- EIA entity ID
- 61597 verified
- Producer type
- Electric Utility verified
- State
- NJ verified
- Net summer capacity (MW)
- 0.7 verified
- Technology
- Solar Photovoltaic verified
- Fuel code
- SUN verified
- Prime mover
- PV verified
- EPM edition
- May 2026 verified
What the source says
2036 12 61597 Caldwell Wastewater Treatment Plant Electric Utility Caldwell Wastewater Treatment Plant Hybr NJ 62027 PV1 0.7 Solar Photovoltaic SUN PV
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf