P L Bartow unit P1, FL — planned retirement, EIA data for May 2026
For P L Bartow unit P1, FL, planned retirement year is 2034; planned retirement month is 6; net summer capacity (mw) is 41.0; technology is Petroleum Liquids; fuel code is DFO; operator is Duke Energy Florida, LLC, verified against its source on 2026-09-24.
- Plant
- P L Bartow verified
- EIA plant ID
- 634 verified
- Generator ID
- P1 verified
- Planned retirement year
- 2034 verified
- Planned retirement month
- 6 verified
- Operator
- Duke Energy Florida, LLC verified
- EIA entity ID
- 6455 verified
- Producer type
- Electric Utility verified
- State
- FL verified
- Net summer capacity (MW)
- 41.0 verified
- Technology
- Petroleum Liquids verified
- Fuel code
- DFO verified
- Prime mover
- GT verified
- EPM edition
- May 2026 verified
What the source says
2034 6 6455 Duke Energy Florida, LLC Electric Utility P L Bartow FL 634 P1 41.0 Petroleum Liquids DFO GT
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf