Madero Grid
For Madero Grid, eia plant id is 63757; generator id is MAD01; planned retirement year is 2042; planned retirement month is 6; operator is Madero Grid, LLC, verified against its source on 2026-08-11.
- Plant
- Madero Grid verified
- EIA plant ID
- 63757 verified
- Generator ID
- MAD01 verified
- Planned retirement year
- 2042 verified
- Planned retirement month
- 6 verified
- Operator
- Madero Grid, LLC verified
- EIA entity ID
- 63451 verified
- Producer type
- IPP verified
- State
- TX verified
- Net summer capacity (MW)
- 100.0 verified
- Technology
- Batteries verified
- Fuel code
- MWH verified
- Prime mover
- BA verified
- EPM edition
- May 2026 verified
What the source says
2042 | 6 | 63451 | Madero Grid, LLC | IPP | Madero Grid | TX | 63757 | MAD01 | 100.0 | Batteries | MWH | BA |
— eia.gov, retrieved 2026-08-11
Source
- eia.govhttps://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06