Madero Grid unit MAD01, TX — planned retirement, EIA data for May 2026
For Madero Grid unit MAD01, TX, planned retirement year is 2042; planned retirement month is 6; net summer capacity (mw) is 100.0; technology is Batteries; fuel code is MWH; operator is Madero Grid, LLC, verified against its source on 2026-09-24.
- Plant
- Madero Grid verified
- EIA plant ID
- 63757 verified
- Generator ID
- MAD01 verified
- Planned retirement year
- 2042 verified
- Planned retirement month
- 6 verified
- Operator
- Madero Grid, LLC verified
- EIA entity ID
- 63451 verified
- Producer type
- IPP verified
- State
- TX verified
- Net summer capacity (MW)
- 100.0 verified
- Technology
- Batteries verified
- Fuel code
- MWH verified
- Prime mover
- BA verified
- EPM edition
- May 2026 verified
What the source says
2042 6 63451 Madero Grid, LLC IPP Madero Grid TX 63757 MAD01 100.0 Batteries MWH BA
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf