Lee County Solid Waste Energy unit GEN1, FL — planned retirement, EIA data for May 2026

For Lee County Solid Waste Energy unit GEN1, FL, planned retirement year is 2029; planned retirement month is 9; net summer capacity (mw) is 39.0; technology is Municipal Solid Waste; fuel code is MSW; operator is Lee County Board-Commissioners, verified against its source on 2026-09-24.

Plant
Lee County Solid Waste Energy verified
EIA plant ID
52010 verified
Generator ID
GEN1 verified
Planned retirement year
2029 verified
Planned retirement month
9 verified
Operator
Lee County Board-Commissioners verified
EIA entity ID
10875 verified
Producer type
IPP verified
State
FL verified
Net summer capacity (MW)
39.0 verified
Technology
Municipal Solid Waste verified
Fuel code
MSW verified
Prime mover
ST verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2029 9 10875 Lee County Board-Commissioners IPP Lee County Solid Waste Energy FL 52010 GEN1 39.0 Municipal Solid Waste MSW ST

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24