Reference Source

Flower Valley I unit FLRV1, TX — planned retirement, EIA data for May 2026

For Flower Valley I unit FLRV1, TX, planned retirement year is 2032; planned retirement month is 8; net summer capacity (mw) is 9.9; technology is Batteries; fuel code is MWH; operator is Flower Valley, verified against its source on 2026-09-24.

Plant
Flower Valley I verified
EIA plant ID
64915 verified
Generator ID
FLRV1 verified
Planned retirement year
2032 verified
Planned retirement month
8 verified
Operator
Flower Valley verified
EIA entity ID
64400 verified
Producer type
IPP verified
State
TX verified
Net summer capacity (MW)
9.9 verified
Technology
Batteries verified
Fuel code
MWH verified
Prime mover
BA verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2032 8 64400 Flower Valley IPP Flower Valley I TX 64915 FLRV1 9.9 Batteries MWH BA

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.