Inver Hills unit 5, MN — planned retirement, EIA data for May 2026
For Inver Hills unit 5, MN, planned retirement year is 2029; planned retirement month is 12; net summer capacity (mw) is 45.0; technology is Natural Gas Fired Combustion Turbine; fuel code is NG; operator is Northern States Power Co - Minnesota, verified against its source on 2026-09-24.
- Plant
- Inver Hills verified
- EIA plant ID
- 1913 verified
- Generator ID
- 5 verified
- Planned retirement year
- 2029 verified
- Planned retirement month
- 12 verified
- Operator
- Northern States Power Co - Minnesota verified
- EIA entity ID
- 13781 verified
- Producer type
- Electric Utility verified
- State
- MN verified
- Net summer capacity (MW)
- 45.0 verified
- Technology
- Natural Gas Fired Combustion Turbine verified
- Fuel code
- NG verified
- Prime mover
- GT verified
- EPM edition
- May 2026 verified
What the source says
2029 12 13781 Northern States Power Co - Minnesota Electric Utility Inver Hills MN 1913 5 45.0 Natural Gas Fired Combustion Turbine NG GT
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf