Panda Solar NC 9, LLC unit 20022, NC — planned retirement, EIA data for May 2026
For Panda Solar NC 9, LLC unit 20022, NC, planned retirement year is 2049; planned retirement month is 6; net summer capacity (mw) is 2.0; technology is Solar Photovoltaic; fuel code is SUN; operator is Panda Solar NC 9, LLC, verified against its source on 2026-09-24.
- Plant
- Panda Solar NC 9, LLC verified
- EIA plant ID
- 62127 verified
- Generator ID
- 20022 verified
- Planned retirement year
- 2049 verified
- Planned retirement month
- 6 verified
- Operator
- Panda Solar NC 9, LLC verified
- EIA entity ID
- 61662 verified
- Producer type
- IPP verified
- State
- NC verified
- Net summer capacity (MW)
- 2.0 verified
- Technology
- Solar Photovoltaic verified
- Fuel code
- SUN verified
- Prime mover
- PV verified
- EPM edition
- May 2026 verified
What the source says
2049 6 61662 Panda Solar NC 9, LLC IPP Panda Solar NC 9, LLC NC 62127 20022 2.0 Solar Photovoltaic SUN PV
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf