Reference Source

Angus Anson unit 2, SD — planned retirement, EIA data for May 2026

For Angus Anson unit 2, SD, planned retirement year is 2040; planned retirement month is 12; net summer capacity (mw) is 99.0; technology is Natural Gas Fired Combustion Turbine; fuel code is NG; operator is Northern States Power Co - Minnesota, verified against its source on 2026-09-24.

Plant
Angus Anson verified
EIA plant ID
7237 verified
Generator ID
2 verified
Planned retirement year
2040 verified
Planned retirement month
12 verified
Operator
Northern States Power Co - Minnesota verified
EIA entity ID
13781 verified
Producer type
Electric Utility verified
State
SD verified
Net summer capacity (MW)
99.0 verified
Technology
Natural Gas Fired Combustion Turbine verified
Fuel code
NG verified
Prime mover
GT verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2040 12 13781 Northern States Power Co - Minnesota Electric Utility Angus Anson SD 7237 2 99.0 Natural Gas Fired Combustion Turbine NG GT

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.