Reference Source

Myrtle Beach unit 2, SC — planned retirement, EIA data for May 2026

For Myrtle Beach unit 2, SC, planned retirement year is 2033; planned retirement month is 12; net summer capacity (mw) is 8.0; technology is Petroleum Liquids; fuel code is DFO; operator is South Carolina Public Service Authority, verified against its source on 2026-09-24.

Plant
Myrtle Beach verified
EIA plant ID
3320 verified
Generator ID
2 verified
Planned retirement year
2033 verified
Planned retirement month
12 verified
Operator
South Carolina Public Service Authority verified
EIA entity ID
17543 verified
Producer type
Electric Utility verified
State
SC verified
Net summer capacity (MW)
8.0 verified
Technology
Petroleum Liquids verified
Fuel code
DFO verified
Prime mover
GT verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2033 12 17543 South Carolina Public Service Authority Electric Utility Myrtle Beach SC 3320 2 8.0 Petroleum Liquids DFO GT

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.