Kotzebue Hybrid unit 11wt, AK — planned retirement, EIA data for May 2026
For Kotzebue Hybrid unit 11wt, AK, planned retirement year is 2026; planned retirement month is 6; net summer capacity (mw) is 0.1; technology is Onshore Wind Turbine; fuel code is WND; operator is Kotzebue Electric Assn Inc, verified against its source on 2026-09-24.
- Plant
- Kotzebue Hybrid verified
- EIA plant ID
- 6304 verified
- Generator ID
- 11wt verified
- Planned retirement year
- 2026 verified
- Planned retirement month
- 6 verified
- Operator
- Kotzebue Electric Assn Inc verified
- EIA entity ID
- 10451 verified
- Producer type
- Electric Utility verified
- State
- AK verified
- Net summer capacity (MW)
- 0.1 verified
- Technology
- Onshore Wind Turbine verified
- Fuel code
- WND verified
- Prime mover
- WT verified
- EPM edition
- May 2026 verified
What the source says
2026 6 10451 Kotzebue Electric Assn Inc Electric Utility Kotzebue Hybrid AK 6304 11wt 0.1 Onshore Wind Turbine WND WT
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/july2026.pdf