Reference Source

Notus Wind 1 unit 1, MA — planned retirement, EIA data for May 2026

For Notus Wind 1 unit 1, MA, planned retirement year is 2035; planned retirement month is 7; net summer capacity (mw) is 1.7; technology is Onshore Wind Turbine; fuel code is WND; operator is Notus Clean Energy LLC, verified against its source on 2026-09-24.

Plant
Notus Wind 1 verified
EIA plant ID
57414 verified
Generator ID
1 verified
Planned retirement year
2035 verified
Planned retirement month
7 verified
Operator
Notus Clean Energy LLC verified
EIA entity ID
56742 verified
Producer type
IPP verified
State
MA verified
Net summer capacity (MW)
1.7 verified
Technology
Onshore Wind Turbine verified
Fuel code
WND verified
Prime mover
WT verified
EPM edition
May 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2035 7 56742 Notus Clean Energy LLC IPP Notus Wind 1 MA 57414 1 1.7 Onshore Wind Turbine WND WT

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.