Merrimack unit 1, NH — planned retirement, EIA data for May 2026
For Merrimack unit 1, NH, planned retirement year is 2027; planned retirement month is 12; net summer capacity (mw) is 108.0; technology is Conventional Steam Coal; fuel code is BIT; operator is Granite Shore Power, verified against its source on 2026-09-24.
- Plant
- Merrimack verified
- EIA plant ID
- 2364 verified
- Generator ID
- 1 verified
- Planned retirement year
- 2027 verified
- Planned retirement month
- 12 verified
- Operator
- Granite Shore Power verified
- EIA entity ID
- 62032 verified
- Producer type
- IPP verified
- State
- NH verified
- Net summer capacity (MW)
- 108.0 verified
- Technology
- Conventional Steam Coal verified
- Fuel code
- BIT verified
- Prime mover
- ST verified
- EPM edition
- May 2026 verified
What the source says
2027 12 62032 Granite Shore Power IPP Merrimack NH 2364 1 108.0 Conventional Steam Coal BIT ST
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-May 2026
— all from eia.gov, retrieved 2026-09-24