Lockheed Martin RMS Syracuse unit SYR1, NY — planned retirement, EIA data for June 2026
For Lockheed Martin RMS Syracuse unit SYR1, NY, planned retirement year is 2027; planned retirement month is 8; net summer capacity (mw) is 1; technology is Batteries; fuel code is MWH; operator is Lockheed Martin RMS Syracuse, verified against its source on 2026-09-24.
- Plant
- Lockheed Martin RMS Syracuse verified
- EIA plant ID
- 61739 verified
- Generator ID
- SYR1 verified
- Planned retirement year
- 2027 verified
- Planned retirement month
- 8 verified
- Operator
- Lockheed Martin RMS Syracuse verified
- EIA entity ID
- 61364 verified
- Producer type
- Industrial verified
- State
- NY verified
- Net summer capacity (MW)
- 1 verified
- Technology
- Batteries verified
- Fuel code
- MWH verified
- Prime mover
- BA verified
- EPM edition
- June 2026 verified
What the source says
2027 | 8 | 61364 | Lockheed Martin RMS Syracuse | Industrial | Lockheed Martin RMS Syracuse | NY | 61739 | SYR1 | 1 | Batteries | MWH | BA
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip