Summit Associates unit SUMA, NJ — planned retirement, EIA data for June 2026
For Summit Associates unit SUMA, NJ, planned retirement year is 2031; planned retirement month is 12; net summer capacity (mw) is 1.9; technology is Solar Photovoltaic; fuel code is SUN; operator is Public Service Elec & Gas Co, verified against its source on 2026-09-24.
- Plant
- Summit Associates verified
- EIA plant ID
- 57726 verified
- Generator ID
- SUMA verified
- Planned retirement year
- 2031 verified
- Planned retirement month
- 12 verified
- Operator
- Public Service Elec & Gas Co verified
- EIA entity ID
- 15477 verified
- Producer type
- Electric Utility verified
- State
- NJ verified
- Net summer capacity (MW)
- 1.9 verified
- Technology
- Solar Photovoltaic verified
- Fuel code
- SUN verified
- Prime mover
- PV verified
- EPM edition
- June 2026 verified
What the source says
2031 | 12 | 15477 | Public Service Elec & Gas Co | Electric Utility | Summit Associates | NJ | 57726 | SUMA | 1.9 | Solar Photovoltaic | SUN | PV
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip