Reference Source

Caldwell Wastewater Treatment Plant Hybr unit PV1, NJ — planned retirement, EIA data for June 2026

For Caldwell Wastewater Treatment Plant Hybr unit PV1, NJ, planned retirement year is 2036; planned retirement month is 12; net summer capacity (mw) is 0.7; technology is Solar Photovoltaic; fuel code is SUN; operator is Caldwell Wastewater Treatment Plant, verified against its source on 2026-09-24.

Plant
Caldwell Wastewater Treatment Plant Hybr verified
EIA plant ID
62027 verified
Generator ID
PV1 verified
Planned retirement year
2036 verified
Planned retirement month
12 verified
Operator
Caldwell Wastewater Treatment Plant verified
EIA entity ID
61597 verified
Producer type
Electric Utility verified
State
NJ verified
Net summer capacity (MW)
0.7 verified
Technology
Solar Photovoltaic verified
Fuel code
SUN verified
Prime mover
PV verified
EPM edition
June 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2036 | 12 | 61597 | Caldwell Wastewater Treatment Plant | Electric Utility | Caldwell Wastewater Treatment Plant Hybr | NJ | 62027 | PV1 | 0.7 | Solar Photovoltaic | SUN | PV

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.