DE Solar 10240 Old Dowd Rd unit PV01, NC — planned retirement, EIA data for June 2026
For DE Solar 10240 Old Dowd Rd unit PV01, NC, planned retirement year is 2026; planned retirement month is 6; net summer capacity (mw) is 1.9; technology is Solar Photovoltaic; fuel code is SUN; operator is Duke Energy Carolinas, LLC, verified against its source on 2026-11-03.
- Plant
- DE Solar 10240 Old Dowd Rd verified
- EIA plant ID
- 57334 verified
- Generator ID
- PV01 verified
- Planned retirement year
- 2026 verified
- Planned retirement month
- 6 verified
- Superseded by
- Already retired. EIA's Form 860M now lists this unit under 'Inventory of Retired Generators as of July 2026', with a retirement of 6/2026 -- the month this page prints as a plan, which has since happened. Read from the permanent archived copy at https://www.eia.gov/electricity/data/eia860m/archive/xls/july_generator2026.xlsx. our reading
- Operator
- Duke Energy Carolinas, LLC verified
- EIA entity ID
- 5416 verified
- Producer type
- Electric Utility verified
- State
- NC verified
- Net summer capacity (MW)
- 1.9 verified
- Technology
- Solar Photovoltaic verified
- Fuel code
- SUN verified
- Prime mover
- PV verified
- EPM edition
- June 2026 verified
Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.
What the source says
2026 | 6 | 5416 | Duke Energy Carolinas, LLC | Electric Utility | DE Solar 10240 Old Dowd Rd | NC | 57334 | PV01 | 1.9 | Solar Photovoltaic | SUN | PV
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip