Reference Source

Intercession City unit P6, FL — planned retirement, EIA data for June 2026

For Intercession City unit P6, FL, planned retirement year is 2034; planned retirement month is 6; net summer capacity (mw) is 47; technology is Petroleum Liquids; fuel code is DFO; operator is Duke Energy Florida, LLC, verified against its source on 2026-09-24.

Plant
Intercession City verified
EIA plant ID
8049 verified
Generator ID
P6 verified
Planned retirement year
2034 verified
Planned retirement month
6 verified
Operator
Duke Energy Florida, LLC verified
EIA entity ID
6455 verified
Producer type
Electric Utility verified
State
FL verified
Net summer capacity (MW)
47 verified
Technology
Petroleum Liquids verified
Fuel code
DFO verified
Prime mover
GT verified
EPM edition
June 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2034 | 6 | 6455 | Duke Energy Florida, LLC | Electric Utility | Intercession City | FL | 8049 | P6 | 47 | Petroleum Liquids | DFO | GT

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.