Bayboro unit P2, FL — planned retirement, EIA data for June 2026
For Bayboro unit P2, FL, planned retirement year is 2026; planned retirement month is 10; net summer capacity (mw) is 18.5; technology is Petroleum Liquids; fuel code is DFO; operator is Duke Energy Florida, LLC, verified against its source on 2026-09-24.
- Plant
- Bayboro verified
- EIA plant ID
- 627 verified
- Generator ID
- P2 verified
- Planned retirement year
- 2026 verified
- Planned retirement month
- 10 verified
- Operator
- Duke Energy Florida, LLC verified
- EIA entity ID
- 6455 verified
- Producer type
- Electric Utility verified
- State
- FL verified
- Net summer capacity (MW)
- 18.5 verified
- Technology
- Petroleum Liquids verified
- Fuel code
- DFO verified
- Prime mover
- GT verified
- EPM edition
- June 2026 verified
What the source says
2026 | 10 | 6455 | Duke Energy Florida, LLC | Electric Utility | Bayboro | FL | 627 | P2 | 18.5 | Petroleum Liquids | DFO | GT
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip