Reference Source

Mount Kisco Landfill Solar & Storage CSG unit KISCB, NY — planned retirement, EIA data for June 2026

For Mount Kisco Landfill Solar & Storage CSG unit KISCB, NY, planned retirement year is 2035; planned retirement month is 12; net summer capacity (mw) is 0.5; technology is Batteries; fuel code is MWH; operator is BQ Energy LLC, verified against its source on 2026-09-24.

Plant
Mount Kisco Landfill Solar & Storage CSG verified
EIA plant ID
63774 verified
Generator ID
KISCB verified
Planned retirement year
2035 verified
Planned retirement month
12 verified
Operator
BQ Energy LLC verified
EIA entity ID
59474 verified
Producer type
IPP verified
State
NY verified
Net summer capacity (MW)
0.5 verified
Technology
Batteries verified
Fuel code
MWH verified
Prime mover
BA verified
EPM edition
June 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2035 | 12 | 59474 | BQ Energy LLC | IPP | Mount Kisco Landfill Solar & Storage CSG | NY | 63774 | KISCB | 0.5 | Batteries | MWH | BA

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.