ILR Landfill unit ILR1, NJ — planned retirement, EIA data for June 2026
For ILR Landfill unit ILR1, NJ, planned retirement year is 2036; planned retirement month is 12; net summer capacity (mw) is 6.6; technology is Solar Photovoltaic; fuel code is SUN; operator is ILR Landfill, verified against its source on 2026-09-24.
- Plant
- ILR Landfill verified
- EIA plant ID
- 60375 verified
- Generator ID
- ILR1 verified
- Planned retirement year
- 2036 verified
- Planned retirement month
- 12 verified
- Operator
- ILR Landfill verified
- EIA entity ID
- 60164 verified
- Producer type
- Electric Utility verified
- State
- NJ verified
- Net summer capacity (MW)
- 6.6 verified
- Technology
- Solar Photovoltaic verified
- Fuel code
- SUN verified
- Prime mover
- PV verified
- EPM edition
- June 2026 verified
What the source says
2036 | 12 | 60164 | ILR Landfill | Electric Utility | ILR Landfill | NJ | 60375 | ILR1 | 6.6 | Solar Photovoltaic | SUN | PV
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip