Ignacio Grid Energy Storage System unit IGN01, TX — planned retirement, EIA data for June 2026
For Ignacio Grid Energy Storage System unit IGN01, TX, planned retirement year is 2042; planned retirement month is 6; net summer capacity (mw) is 100; technology is Batteries; fuel code is MWH; operator is Ignacio Grid, LLC, verified against its source on 2026-09-24.
- Plant
- Ignacio Grid Energy Storage System verified
- EIA plant ID
- 64089 verified
- Generator ID
- IGN01 verified
- Planned retirement year
- 2042 verified
- Planned retirement month
- 6 verified
- Operator
- Ignacio Grid, LLC verified
- EIA entity ID
- 63723 verified
- Producer type
- IPP verified
- State
- TX verified
- Net summer capacity (MW)
- 100 verified
- Technology
- Batteries verified
- Fuel code
- MWH verified
- Prime mover
- BA verified
- EPM edition
- June 2026 verified
What the source says
2042 | 6 | 63723 | Ignacio Grid, LLC | IPP | Ignacio Grid Energy Storage System | TX | 64089 | IGN01 | 100 | Batteries | MWH | BA
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip