Airport Industrial unit IC2, CO — planned retirement, EIA data for June 2026
For Airport Industrial unit IC2, CO, planned retirement year is 2033; planned retirement month is 12; net summer capacity (mw) is 2.5; technology is Petroleum Liquids; fuel code is DFO; operator is Black Hills Colorado Electric, LLC, verified against its source on 2026-09-24.
- Plant
- Airport Industrial verified
- EIA plant ID
- 7995 verified
- Generator ID
- IC2 verified
- Planned retirement year
- 2033 verified
- Planned retirement month
- 12 verified
- Operator
- Black Hills Colorado Electric, LLC verified
- EIA entity ID
- 56146 verified
- Producer type
- Electric Utility verified
- State
- CO verified
- Net summer capacity (MW)
- 2.5 verified
- Technology
- Petroleum Liquids verified
- Fuel code
- DFO verified
- Prime mover
- IC verified
- EPM edition
- June 2026 verified
What the source says
2033 | 12 | 56146 | Black Hills Colorado Electric, LLC | Electric Utility | Airport Industrial | CO | 7995 | IC2 | 2.5 | Petroleum Liquids | DFO | IC
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip