Lee County Solid Waste Energy unit GEN1, FL — planned retirement, EIA data for June 2026
For Lee County Solid Waste Energy unit GEN1, FL, planned retirement year is 2029; planned retirement month is 9; net summer capacity (mw) is 39; technology is Municipal Solid Waste; fuel code is MSW; operator is Lee County Board-Commissioners, verified against its source on 2026-09-24.
- Plant
- Lee County Solid Waste Energy verified
- EIA plant ID
- 52010 verified
- Generator ID
- GEN1 verified
- Planned retirement year
- 2029 verified
- Planned retirement month
- 9 verified
- Operator
- Lee County Board-Commissioners verified
- EIA entity ID
- 10875 verified
- Producer type
- IPP verified
- State
- FL verified
- Net summer capacity (MW)
- 39 verified
- Technology
- Municipal Solid Waste verified
- Fuel code
- MSW verified
- Prime mover
- ST verified
- EPM edition
- June 2026 verified
What the source says
2029 | 9 | 10875 | Lee County Board-Commissioners | IPP | Lee County Solid Waste Energy | FL | 52010 | GEN1 | 39 | Municipal Solid Waste | MSW | ST
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip