Reference Source

Arsenal Hill unit 5, LA — planned retirement, EIA data for June 2026

For Arsenal Hill unit 5, LA, planned retirement year is 2029; planned retirement month is 5; net summer capacity (mw) is 110; technology is Natural Gas Steam Turbine; fuel code is NG; operator is Southwestern Electric Power Co, verified against its source on 2026-09-24.

Plant
Arsenal Hill verified
EIA plant ID
1416 verified
Generator ID
5 verified
Planned retirement year
2029 verified
Planned retirement month
5 verified
Operator
Southwestern Electric Power Co verified
EIA entity ID
17698 verified
Producer type
Electric Utility verified
State
LA verified
Net summer capacity (MW)
110 verified
Technology
Natural Gas Steam Turbine verified
Fuel code
NG verified
Prime mover
ST verified
EPM edition
June 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2029 | 5 | 17698 | Southwestern Electric Power Co | Electric Utility | Arsenal Hill | LA | 1416 | 5 | 110 | Natural Gas Steam Turbine | NG | ST

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.