Reference Source

Lawrence Energy Center unit 4, KS — planned retirement, EIA data for June 2026

For Lawrence Energy Center unit 4, KS, planned retirement year is 2032; net summer capacity (mw) is 109.1; technology is Conventional Steam Coal; fuel code is SUB; operator is Evergy Kansas Central, Inc, verified against its source on 2026-09-24.

Plant
Lawrence Energy Center verified
EIA plant ID
1250 verified
Generator ID
4 verified
Planned retirement year
2032 verified
Operator
Evergy Kansas Central, Inc verified
EIA entity ID
22500 verified
Producer type
Electric Utility verified
State
KS verified
Net summer capacity (MW)
109.1 verified
Technology
Conventional Steam Coal verified
Fuel code
SUB verified
Prime mover
ST verified
EPM edition
June 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2032 | | 22500 | Evergy Kansas Central, Inc | Electric Utility | Lawrence Energy Center | KS | 1250 | 4 | 109.1 | Conventional Steam Coal | SUB | ST

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.