Newhalem unit 20, WA — planned retirement, EIA data for June 2026
For Newhalem unit 20, WA, planned retirement year is 2027; planned retirement month is 12; net summer capacity (mw) is 2.3; technology is Conventional Hydroelectric; fuel code is WAT; operator is City of Seattle - (WA), verified against its source on 2026-09-24.
- Plant
- Newhalem verified
- EIA plant ID
- 9842 verified
- Generator ID
- 20 verified
- Planned retirement year
- 2027 verified
- Planned retirement month
- 12 verified
- Operator
- City of Seattle - (WA) verified
- EIA entity ID
- 16868 verified
- Producer type
- Electric Utility verified
- State
- WA verified
- Net summer capacity (MW)
- 2.3 verified
- Technology
- Conventional Hydroelectric verified
- Fuel code
- WAT verified
- Prime mover
- HY verified
- EPM edition
- June 2026 verified
What the source says
2027 | 12 | 16868 | City of Seattle - (WA) | Electric Utility | Newhalem | WA | 9842 | 20 | 2.3 | Conventional Hydroelectric | WAT | HY
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip