Reference Source

Short Mountain unit 2, OR — planned retirement, EIA data for June 2026

For Short Mountain unit 2, OR, planned retirement year is 2027; planned retirement month is 12; net summer capacity (mw) is 0.8; technology is Landfill Gas; fuel code is LFG; operator is Emerald People's Utility Dist, verified against its source on 2026-09-24.

Plant
Short Mountain verified
EIA plant ID
7413 verified
Generator ID
2 verified
Planned retirement year
2027 verified
Planned retirement month
12 verified
Operator
Emerald People's Utility Dist verified
EIA entity ID
40437 verified
Producer type
Electric Utility verified
State
OR verified
Net summer capacity (MW)
0.8 verified
Technology
Landfill Gas verified
Fuel code
LFG verified
Prime mover
IC verified
EPM edition
June 2026 verified
Sourceeia.gov
Verified
Review by
DatasetPlanned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly

What the source says

2027 | 12 | 40437 | Emerald People's Utility Dist | Electric Utility | Short Mountain | OR | 7413 | 2 | 0.8 | Landfill Gas | LFG | IC

— eia.gov, retrieved 2026-09-24

Where each value comes from

The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.

EPM edition

Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026

— all from eia.gov, retrieved 2026-09-24

Source

Last verified against source: . Due for re-check by . This page as Markdown · OKF bundle · full dataset as JSON.