Mayo unit 1, NC — planned retirement, EIA data for June 2026
For Mayo unit 1, NC, planned retirement year is 2031; planned retirement month is 6; net summer capacity (mw) is 704; technology is Conventional Steam Coal; fuel code is BIT; operator is Duke Energy Progress - (NC), verified against its source on 2026-09-24.
- Plant
- Mayo verified
- EIA plant ID
- 6250 verified
- Generator ID
- 1 verified
- Planned retirement year
- 2031 verified
- Planned retirement month
- 6 verified
- Operator
- Duke Energy Progress - (NC) verified
- EIA entity ID
- 3046 verified
- Producer type
- Electric Utility verified
- State
- NC verified
- Net summer capacity (MW)
- 704 verified
- Technology
- Conventional Steam Coal verified
- Fuel code
- BIT verified
- Prime mover
- ST verified
- EPM edition
- June 2026 verified
What the source says
2031 | 6 | 3046 | Duke Energy Progress - (NC) | Electric Utility | Mayo | NC | 6250 | 1 | 704 | Conventional Steam Coal | BIT | ST
— eia.gov, retrieved 2026-09-24
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026
— all from eia.gov, retrieved 2026-09-24
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/august2026.zip