Glades Pike Generation Plant unit CAT1, PA — planned retirement, EIA data for April 2026
For Glades Pike Generation Plant unit CAT1, PA, planned retirement year is 2026; planned retirement month is 1; net summer capacity (mw) is 1.6; technology is Landfill Gas; fuel code is LFG; operator is State Correctnl Inst Laurel Highlands, verified against its source on 2026-10-16.
- Plant
- Glades Pike Generation Plant verified
- EIA plant ID
- 59759 verified
- Generator ID
- CAT1 verified
- Planned retirement year
- 2026 verified
- Planned retirement month
- 1 verified
- Superseded by
- Already retired, and not in the month planned. EIA's Form 860M now lists this unit under 'Inventory of Retired Generators as of July 2026', with a retirement of 5/2026 rather than the 1/2026 this page prints as a plan. Read from the permanent archived copy at https://www.eia.gov/electricity/data/eia860m/archive/xls/july_generator2026.xlsx. our reading
- Operator
- State Correctnl Inst Laurel Highlands verified
- EIA entity ID
- 59526 verified
- Producer type
- Commercial verified
- State
- PA verified
- Net summer capacity (MW)
- 1.6 verified
- Technology
- Landfill Gas verified
- Fuel code
- LFG verified
- Prime mover
- IC verified
- EPM edition
- April 2026 verified
Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.
What the source says
2026 1 59526 State Correctnl Inst Laurel Highlands Commercial Glades Pike Generation Plant PA 59759 CAT1 1.6 Landfill Gas LFG IC
— eia.gov, retrieved 2026-10-16
Where each value comes from
The value above is stated away from the sentence quoted with the answer, so the passage that states it is shown here too.
EPM edition
Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-April 2026
— all from eia.gov, retrieved 2026-10-16
Source
- eia.govhttps://www.eia.gov/electricity/monthly/archive/june2026.pdf