IEC 62264-3:2007
For IEC 62264-3:2007, item title is Enterprise-control system integration — Part 3: Activity models of manufacturing operations management; status code is 9599; successor is IEC 62264-3:2016; withdrawn / published date is 2007-06-19, recorded from its source on 2026-08-05.
- Identifier
- IEC 62264-3:2007 verified
- Item title
- Enterprise-control system integration — Part 3: Activity models of manufacturing operations management verified
- Status code
- 9599 verified
- Successor
- IEC 62264-3:2016
- Withdrawn / published date
- 2007-06-19 verified
Verified
Review by
What the source says
40949,IS,,IEC 62264-3:2007,Enterprise-control system integration — Part 3: Activity models of manufacturing operations management,Intégration du système de commande d'entreprise — Partie 3: Modèles d'activité pour la gestion des opérations de fabrication,2007-06-19,1,['25.040.40'],ISO/TC 184/SC 5,9599,,[67480],"['en','fr']",212,"It defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control funct
— isopublicstorageprod.blob.core.windows.net, retrieved 2026-08-05
Source
- isopublicstorageprod.blob.core.windows.nethttps://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv