Pier Inspection

For Pier Inspection, process is Residential building inspection sequence; jurisdiction is Creve Coeur, Missouri; order is 3; what must already be done is Reinforcing steel must be placed to allow for proper inspections; what may not proceed until it passes is No concrete may be placed without this inspection being approved, recorded from its source on 2026-08-11.

Step
Pier Inspection verified
Process
Residential building inspection sequence our reading
Jurisdiction
Creve Coeur, Missouri our reading
Order
3 verified
What must already be done
Reinforcing steel must be placed to allow for proper inspections verified
What may not proceed until it passes
No concrete may be placed without this inspection being approved verified
Sourcecrevecoeurmo.gov
Verified
Review by
DatasetWhat must pass before the next step: mandated step order in regulated processes

Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.

What the source says

3. Pier Inspection A pier inspection is required where special foundations, such as drilled and poured-in-place concrete piers, caissons, driven piles and other extraordinary types are used. Additional pier inspections may be required if the building official determines the size of the project warrants it. The building official may require a Special Inspector to make these inspections. Reinforcing steel must be placed to allow for proper inspections. A city-approved barrier must be in place around the excavation until backfilling has occurred. No concrete may be placed without this inspection being approved.

crevecoeurmo.gov, retrieved 2026-08-11

Sources disagree

More than one authority states this, and they do not state the same thing. Both are reproduced with the source each came from — deciding between them is yours, not ours.

Process

crevecoeurmo.gov says process is Residential building inspection sequence, as of 2026-08-11.

3. Pier Inspection A pier inspection is required where special foundations, such as drilled and poured-in-place concrete piers, caissons, driven piles and other extraordinary types are used. Additional pier inspections may be required if the building official determines the size of the project warrants it. The building official may require a Special Inspector to make these inspections. Reinforcing steel must be placed to allow for proper inspections. A city-approved barrier must be in place around the excavation until backfilling has occurred. No concrete may be placed without this inspection being approved.

https://www.crevecoeurmo.gov/86/Sequence-of-Inspections

crevecoeurmo.gov says process is Wood deck inspection sequence, as of 2026-08-11.

Pier Inspection: An inspection of the location, dimensions and depth of the piers must be completed and approved to prior to pouring any concrete. Inspector will also verify suitable soil conditions.

https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks

What may not proceed until it passes

crevecoeurmo.gov says what may not proceed until it passes is No concrete may be placed without this inspection being approved, as of 2026-08-11.

3. Pier Inspection A pier inspection is required where special foundations, such as drilled and poured-in-place concrete piers, caissons, driven piles and other extraordinary types are used. Additional pier inspections may be required if the building official determines the size of the project warrants it. The building official may require a Special Inspector to make these inspections. Reinforcing steel must be placed to allow for proper inspections. A city-approved barrier must be in place around the excavation until backfilling has occurred. No concrete may be placed without this inspection being approved.

https://www.crevecoeurmo.gov/86/Sequence-of-Inspections

crevecoeurmo.gov says what may not proceed until it passes is must be completed and approved to prior to pouring any concrete, as of 2026-08-11.

Pier Inspection: An inspection of the location, dimensions and depth of the piers must be completed and approved to prior to pouring any concrete. Inspector will also verify suitable soil conditions.

https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks